Browse all practice questions for the USACE Contracting Officer Review Board (CORB) Practice Test. Search by topic, open any question and review its full explanation, then test yourself in the practice quiz.

USACE Contracting Officer Review Board (CORB) Practice Test course image
More practice questions

These questions are part of the practice quiz. Start practicing

  • Under what condition can full and open competition be bypassed for an unsolicited proposal?
  • Who appoints the Source Selection Authority for contracts valued between 100 million and 500 million?
  • Which law’s violations are listed as grounds to withhold payments on a contract?
  • How do you determine whether a change is within the scope of the contract?
  • Under IAW UAI, if an O&M construction award exceeds the IGE by 15%, who approves?
  • Where is information on Inherently Government Functions located?
  • Which action is NOT within the COR's authority?
  • When evaluating whether Contractor A can bid as a prime on a new source selection while they will provide testing under the current contract, which factor must be avoided?
  • Which statement correctly describes non-severable versus severable service contracts in terms of funding and period of performance?
  • Under which contract actions is a Command Service Executive (CSE) Memo required?
  • Which statement correctly describes unilateral option exercise?
  • Which FAR Part covers Cost Accounting Standards (CAS)?
  • Threshold and approval for D&F for 'Justification of Contract Type - Award-Fee Contracts'
  • Which statement best describes clarifications in the context of the source selection?
  • Which training tools are recommended for a new Contract Specialist to accomplish duties?
  • In simplified acquisitions, which scenario establishes a binding contract?
  • Which action would constitute a violation of the Anti-deficiency Act?
  • Who may delegate certification authority for requirements valued less than what amount?
  • What is the first step a Contracting Officer should take when the COR reports that services were not performed?
  • Statutory fee limitation for design by an AE form on a GOV contract, and what is included?
  • For acquisition strategy of not performance-based services, what threshold requires SCO approval?
  • Which item must not be disclosed in a pre-award debriefing?
  • In a post-award debriefing, which item is typically disclosed?
  • UCF stands for what?
  • In Design Bid Build, when must BCOES be signed and prepared?
  • The clause 'Conditions upon availability of funds' is included in which contract clause?
  • Which of the following is NOT one of the seven exceptions to full and open competition?
  • When must a BCOES be received?
  • Threshold and approval for determination of consolidation.
  • What does BCOES evaluate?
  • Which document designates the ACO for each contract?
  • Who signs the designation letter for each contract the ACO is involved with?
  • What makes a contractor responsible?
  • Posting solicitations and related documents via PIEE will automatically transmit to which system?
  • Under what cost threshold is the use of operating and maintenance (O&M) funds for construction allowed?
  • Can you award a contract to an offeror other than the SSA's recommended choice?
  • Which statement best describes the difference between Acquisition Plan and Acquisition Strategy?
  • Where is the contracting officer authority defined?
  • Which item represents a D&F responsibility criterion?
  • In simplified acquisitions, when is a contract established?
  • Which statement about NTE inclusion in a UCA is true?
  • Who is delegated the authority under DFARS 215.371 to waive the requirement to resolicit for an additional period of at least 30 days?
  • Define an Excusable Delay.
  • What is the Simplified Acquisition Threshold (SAT) in the contingency contracting thresholds?
  • If a contractor is debarred, suspended, or proposed for debarment, what is allowed regarding contracts in existence at the time of debarment?
  • Which of the following is a bona fide measurement of the Bona Fide Need Rule for appropriations?
  • Under J&A posting requirements, the justification must be publicly available within how many days after contract award, except for certain circumstances?
  • Which statement best defines a responsible contractor?
  • Small Business is selected to be awarded a contract, but they do not meet the responsibility criteria - what must you do?
  • Which FAR Part covers consolidation?
  • What is the dollar threshold that establishes the need for a Department of Labor wage determination?
  • What happens in Phase Two of the Two-Phase Design Build selection?
  • What fiscal issue arises when a PCO uses FYXX O&M funds to acquire computers that could be delivered immediately, but are intended for a future building?
  • Which statement best captures the distinction between 'Responsive' and 'Responsible' bidders?
  • Which of the following is NOT listed as one of the seven exceptions that allow non-competitive award?
  • Which statement describes an inherently governmental function?
  • Which statement about CAS is correct?
  • Which term describes minor issues discussed prior to establishing the competitive range to improve understanding of proposals?
  • For acquisitions valued between 10 million and 100 million, who has approval authority?
  • Which of the following is the minimum posting duration for J&As?
  • Where is the documents review and approval matrix located?
  • Formal acquisition plans are required for programs with total cost at least how much?
  • Organizational Conflict of Interest (OCI) written analysis to avoid, mitigate, or neutralize a potential or actual OCI has what threshold?
  • What defines a latent defect?
  • Which of the following is an example of a non-severable contract?
  • Which factor is commonly considered in an emergency acquisition?
  • One-step selection procedure is authorized for military construction projects under what conditions?
  • How does a contractor indicate acceptance of a purchase order?
  • What is consideration?
  • Which of the following is NOT a stated purpose of FPDS-NG Contract Action Reports (CARs)?
  • Which of the following is an example of an inherently governmental function?
  • When an acquisition contains brand name specifications, what must the contracting officer include with the solicitation?
  • Which regulation references the limitation on the architect-engineer contract price for design services?
  • Which of the following are the three basic fiscal constraints for appropriated funds?
  • What are some of the benefits of competition in federal contracting?
  • Severable services may be funded in what manner?
  • Who is responsible for the cost of repair of Government Furnished Property?
  • How many phases are listed for PDBP?
  • When should the Service Contract Approval Form be included in the contract file?
  • Which of the following is NOT a PDBP phase?
  • Which threshold triggers formal acquisition planning requirements?
  • Which statement describes a key purpose of a Blanket Purchase Agreement?
  • What is the objective of the determination to reject offers suspected of being collusive when the disclosure was made to restrict competition?
  • The depth of pre-negotiation analysis should relate to which factors?
  • Which statement best describes the authority of a Contracting Officer?
  • In the Two-Phase Design Build Selection Procedure, which statement is true?
  • Threshold and approval for D&F 'Contract Type - Cost-Reimbursement'
  • Which three limitations must be checked prior to making new obligations?
  • Which is a possible penalty under the Anti-deficiency Act?
  • Which of the following is a factor that may justify termination for default?
  • Who is the district chief of contracting?
  • In Design Bid Build, how are the owner’s contracts arranged?
  • Who signs RFP letters for construction modifications above the ACO warrant threshold?
  • What is the micro-purchase threshold?
  • The Price Negotiation Memorandum (PNM) serves what purpose?
  • What does the Berry Amendment do?
  • Who approves the Acquisition/Contract Strategy for values greater than $93 million?
  • Before negotiation, which prices must POM include?
  • What are the exceptions to the Fair Opportunity to Compete concept for orders under multiple-awards contracts?
  • Why is it important to assure FPDS-NG Contract Action Reports (CARs) are complete and accurate?
  • Which of the following statements about Blanket Purchase Agreements is true?
  • Which statement about GFP disposition at contract end is correct?
  • Under the Bona Fide Need Rule, when is the bona fide need for supply items determined?
  • Under IAW UAI, which authority approves an award for Military Construction if the IGE exceeds 15%?
  • What is a bridge contract and why is it a concern?
  • In contract formation, which two elements must consideration have?
  • Which official approves the Justification and Approval (JA) for contract actions up to $750,000?
  • Which of the following is a technique to promote early exchange of information with industry?
  • What must be done before selecting LPTA for construction projects under NDAA Sections 813 & 822?
  • Which procedure is used for procurements under FAR Part 13?
  • According to FAR 10.002(b)(1), how long is market research considered relevant?
  • If leadership directs actions contrary to your legal guidance, what is the proper course of action?
  • The Administrative Contracting Officer under USACE must be which type of employee?
  • Which statement describes Design-Bid-Build?
  • A bridge contract is best described as which of the following?
  • OCI stands for which term in contracting context?
  • What is an unauthorized commitment?
  • Which option is a valid alternative to finalizing a PWS when the PDT struggles to draft a proposal?
  • Which source selection process allows for a tradeoff between non-cost factors and cost/price to achieve best value?
  • Which system should be discontinued for transmitting/receiving proposals according to policy?
  • When should a Letter Contract be issued?
  • Which statement best describes the elements of a legally binding contract?
  • In CPARS performance assessments, which attributes contribute to a high-quality CPARS entry?
  • Which of the following is commonly cited as an inadequacy in requirements or PWS that could reduce competition?
  • If a small business appears to be the apparent awardee but cannot be determined responsible, what action should you take?
  • Under multiple-awards contracts, an order must exceed what amount to require fair opportunity, unless exceptions apply?
  • If leadership direction conflicts with mandatory legal guidance, what is the proper course of action?
  • Under FAR 15.404-1(a)(3), which statement accurately describes when to use cost analysis and price analysis?
  • What is the purpose of the Bona Fide Need Rule in obligations and appropriations?
  • In Phase Two, what may be included with technical proposals?
  • Which item is included in a post-award debriefing (when applicable)?
  • In Design Build procurement, what is the primary advantage?
  • Define Severable and Non-severable services and differentiate between the two.
  • A UCA may remain unsettled for up to how many months?
  • When evaluating whether to use year-end funds to purchase replenishment spares, what two major concerns must you address?
  • Which item is NOT listed as a benefit of competition?
  • If preparing to exercise an option year on a contract, what must you have to exercise the option?
  • Under FAR 12.603, when a written solicitation will be issued, what procedure is used to reduce the time required to solicit and award contracts for the acquisition of commercial items?
  • What does the lead-time exception relate to in incremental funding, and why did it not apply in the CY13 computer example?
  • Which statement correctly describes Progress Payments under FAR 32.104?
  • For a contract estimated at $350M, who is the appointing authority for source selection?
  • For commercial item acquisitions under FAR 12.207, which contract types are acceptable?
  • Which step follows 'Conduct initial proposal evaluations' in the Source Selection Procedures?
  • How is an Unsolicited Proposal defined?
  • If a Davis-Bacon wage rate changes after a source selection decision has been made but before award on a construction RFP, what must you do?
  • What is the purpose of MATOC in the context of multiple award task order contracts?
  • What does HCA stand for?
  • Which office provides written legal sufficiency for bid-related issues?
  • Two-phase design-build selection procedures threshold references include which documents?
  • Threshold and approval for D&F for 'Use of Time and Material (T&M) Contract and Labor-hour Contract prior to execution of the base period or any option periods of three years or less'
  • Under Buy American Act guidance, when should FAR 52.225-9 be included?
  • What is the typical monetary limit for an ACO's authority to administer construction contracts and modifications?
  • Which of the following is NOT an element of an IGE?
  • When should UCA/Letter Contracts be used?
  • What mentoring method is described for a new Contract Specialist?
  • In a civil works procurement where proposals are double the IGE but within 1% of each other and the SSA discounts the IGE, what should the Contracting Officer do?
  • Which reference group is cited for Acquisition Strategy threshold for not-performance-based services?
  • What is included in a Stop Work Order?
  • MATOC meaning
  • Which regulations govern ratification of unauthorized commitments?
  • Threshold and approval for D&F for 'Other than full and open competitions for International Agreement competitive restriction'
  • What is the general applicability of Project Labor Agreements (PLAs)?
  • Who must authorize in writing compelling reasons for renewal or extension of current contracts with a debarred contractor?
  • What is the main purpose of the post award conference/orientation/start to work meeting?
  • Which statutory authority corresponds to permitting contracting without full and open competition due to a sole-source requirement?
  • In a full and open competitive negotiated acquisition, what two criteria determine which proposals are placed in the competitive range for discussions?
  • Who maintains contractual authority for contracts under the SAT?
  • If the PCO is not SSA, who appoints the SSA for contracts under $100 million?
  • Brand-name descriptions, and other descriptions that permit offers of products other than those named, provide for full and open competition and do not require justifications.
  • Which option correctly lists the four items to determine when a CSE Memo is required—viewed for planning and approval coordination?
  • What does D&F stand for in contracting practices?
  • Which statement about UCA approvals is true?
  • Who approves the Acquisition/Contract Strategy for values less than $93 million?
  • Which statement reflects a key to effective competition?
  • Which entity is primarily responsible for evaluating proposals in the Source Selection process?
  • Which market research technique involves querying a government-wide database of contracts and procurement instruments?
  • Which would not be considered an Excusable Delay?
  • Who is responsible for the compliance review?
  • Who is typically the command SCO?
  • In CPARS, what is the purpose of the small business narrative?
  • Which document lists the threshold for Acquisition Strategy for not performance-based services?
  • What is the usual threshold for J&A signed by the alternate SCO?
  • How many days does a cure notice grant the contractor to cure the deficiency?
  • Which statement best describes LPTA?
  • Under 13 CFR 124.506b, what is the sole-source threshold for ANC 8(a) companies without and with J&A?
  • What does the acronym ACO stand for in this contracting context?
  • What happens to proposals not included in the competitive range?
  • An Acquisition Strategy document is required for Army service acquisitions greater than the Simplified Acquisition Threshold. How is the approval authority determined?
  • Under a Blanket Purchase Agreement, when is money obligated?
  • Which documents specify the Acquisition Strategy thresholds?
  • What must the SSP address regarding PLA?
  • For non-commercial procurements over $750k, what data are required and what analysis is performed?
  • What is the purpose of the Request for Services Contract Approval form?
  • Who signs the warrant for an Administrative Contracting Officer?
  • Where is information about the COR program located?
  • Which statement best describes a Certificate of Current Cost or Pricing Data?
  • Expired appropriations have what characteristic?
  • Which option describes the proper method to address an organizational conflict of interest in a solicitation?
  • In appropriation constraints, Bona Fide Need refers to what?
  • Which statement best describes a non-personal services contract?
  • Under the FAR 52.215-8 order of precedence, which document takes precedence when the Specifications conflict with the Schedule (excluding specifications)?
  • BCOES stands for which of the following?
  • FAR Part 36 covers which type of contracts?
  • Who has the authority to exempt from the use of the Uniform Contract Format (UCF) in individual contracts?
  • Which statement best describes severable services?
  • Penalties for a violation of the ADA may include which of the following?
  • Which statement best describes a Trade-Off approach in procurement?
  • Which market research technique involves early engagement with potential offerors through structured discussions?
  • Bona Fide Needs rule: In severable services, when must service begin?
  • Which regulations govern the Price Negotiation Memorandum (PNM) requirements?
  • Which determinations must be made prior to exercising an option?
  • Who approves the ratification authority for contract actions greater than $100,000?
  • In a sole-source procurement with a single offer and a 30-day receipt period, what action must the contracting officer take to determine if the offered price is fair and reasonable?
  • What is an unauthorized commitment and who ratifies unauthorized commitments exceeding $100,000?
  • Phase One is based on qualification proposals; Phase Two is limited to the most highly qualified firms that submit technical proposals and may include preliminary design and price proposals. Which description matches this process?
  • Which statement best describes the difference between price analysis and cost analysis?
  • Which documents should the Procuring Contracting Officer review to determine if a change is within the scope of the contract?
  • Urgent and Compelling J&A posting timeframe?
  • What is the threshold for Justification for Sole Source Award to 8(a)?
  • Describe the difference between a Statement of Work (SOW) and a Performance Work Statement (PWS) and when each is appropriate.
  • Under water procurement policy, when may bottled water be purchased?
  • What is the threshold for requiring certified cost or pricing data?
  • Under fixed-price contracts, when is incremental funding permissible?
  • Congressional notification is required for awards above what amount, and who approves?
  • Which order type is used to procure services?
  • Pre-award debriefings must include which of the following at a minimum?
  • What is the maximum allowed proposal price above the IGCE for Civil Works Contracts?
  • Issuing a letter authorizing expenditures before funds are available would be anti-deficient.
  • Which CPARS requirement is essential when giving a rating other than Satisfactory?
  • Under a UCA, you may not obligate more than what percentage of the NTE?
  • In FAR Part 15, what procedures are used to weigh a PLA against other offers?
  • What are the three types of indefinite-delivery contracts and what is the use for each type?
  • If unauthorized changes are made by unauthorized personnel, who must be notified?
  • Offeror experience and past performance are distinguished by which principle?
  • Design Build procurement will always use a two-step process, consisting of receiving capabilities and receiving proposals.
  • Which item is listed as an example of an end item under the Berry Amendment?
  • Under Lowest Price Technically Acceptable (LPTA), which statement best describes when LPTA is appropriate?
  • Which element is required for an Urgent and Compelling J&A and must be posted within 30 days of contract award?
  • For a formal IGE over the SAT, which item is NOT a stated requirement?
  • Which official approves the JA for actions between $15,000,000 and $100,000,000?
  • What is a key rule for OMA funds regarding cross-year obligations?
  • Which statement describes an active appropriation?
  • Which statement best contrasts Progress Payments and Performance Based Payments?
  • Which FAR provisions are cited for the 8(a) sole-source justification?
  • Which contract type places full responsibility for performance costs and resulting profit on the contractor?
  • Threshold and approval for D&F for 'Use of letter contracts (undefinitized contract actions)'
  • Under which conditions are vendors ranked?
  • What statement is true about costs in a contract: allocable vs allowable?
  • What does NTE stand for in this context?
  • FF&E stands for what in building projects?
  • Which statement best reflects the six percent limitation for AE design costs and what is included?
  • What is a personal services contract?
  • Which clauses caution the contractor that costs cannot be incurred beyond the amount allotted and that the Government is not obligated to pay beyond that amount?
  • When should a COR be nominated in the acquisition process?
  • Which elements are included in performance-based requirements?
  • Which set of elements constitutes a binding contract?
  • Which exception allows DoD agencies to obligate funds at contract award to finance a severable service contract with a period of performance not to exceed 12 months?
  • Which statement best characterizes clarifications, communications, and discussions during a competitive source selection?
  • Where do you find contracting by negotiation in the UAI?
  • Which official approves the JA for actions greater than $100,000,000?
  • What avenue of recourse do contractors have when they feel they are owed additional time or are entitled to damages from the Government on a contract?
  • When must the Davis-Bacon/Wage Determination be pulled?
  • In a fiscal year end purchase with no funds available, what must be obtained before proceeding?
  • What is the difference between SAT and SAP?
  • Who makes the final Source Selection decision and writes the SSDD?
  • Which outcome is most likely from performing a BCOES review before construction contracts?
  • Which COR designation corresponds to the most complex and high-risk contracts?
  • For Design Bid Build, what are the required synopsis and solicitation posting days?
  • What is the difference between obligation and commitment of funds?
  • Which modification is typically bilateral?
  • Discussions, clarifications, and communications differ in that discussions require what?
  • What is Phase One in the Two-Phase Design Build Selection Procedure?
  • Which is NOT an exception to certified cost & pricing for actions over $2M?
  • What does D&F stand for in option exercise determinations?
  • Under what condition may the KO withhold payment on a contract?
  • Where in the contract can site visit information be found?
  • For urgent procurements, which J&A element must be included?
  • What are the standard minimum synopsis and solicitation posting durations for construction procurements?
  • Is it permissible to have a non-Government contractor employee as chief of the technical evaluation team and a voting member of the source selection board?
  • Is a J&A required for brand-name or equal specifications?
  • Synopsis is required if the action threshold is exceeded by how much?
  • Which statement is true regarding AQC Plan and Acq Strategy usage?
  • During which stage must the proposed use of a PLA be evaluated?
  • If a contractor is listed on the List of Parties Excluded from Federal Procurement and Non-procurement Programs, what is the rule on continuation of current contracts with the contractor?
  • Which actions are prohibited for a debarred contractor unless the agency head makes a written determination?
  • Under two-phase procedures, the Phase-Two procurement is issued after Phase-One and includes the remainder.
  • What is a Delivery Order used for?
  • A Blanket Purchase Agreement can be used only if no existing requirements contract exists for the same supply/service.
  • In two-phase selection procedures, phase-one may be issued with what type of information?
  • Which statement correctly characterizes non-severable service contracts?
  • SCO stands for which role in contracting?
  • For a two-phase design-build selection, what is the threshold amount for a determination that having more than five offerors is in the Government's interest?
  • Under DFARS 201.602, a COR is required for which condition?
  • Which J&A type is posted with the solicitation?
  • Which statement correctly describes bundling and consolidation?
  • What does performance-based mean?
  • Why is the commerciality determination important?
  • What are the two broad categories used to group government contract types?
  • Kick-off meeting timing occurs how many days before the start of performance?
  • The SSEB documents its decision in which document?
  • Waivers for OCI are referenced under which FAR provision?
  • Which reference is cited for threshold and approval for determination of consolidation?
  • Which official approves the JA for actions between $750,000 and $15,000,000?
  • BCOES applicability applies to which type of contracts?
  • Under FAR 45, can GFP be included in a solicitation and the resulting contract, and what steps are necessary?
  • For a non-ANC 8(a) company, what is the sole-source ceiling?
  • Which statement correctly describes non-severable service contracts under the Bona Fide Need Rule?
  • What are liquidated damages and when can they be used?
  • What penalties may result from a willful Anti-deficiency Act violation?
  • Who is the USACE Ombudsman and what is the protest threshold?
  • When acquiring commercial items, which contract types are normally used and which are prohibited?
  • How are GFP adjustments handled during contract administration?
  • Which statement best describes the Anti-deficiency Act (ADA)?
  • Which FAR clauses define a personal services contract?
  • Under DFARS, when can a fixed-price contract be incrementally funded with funds from multiple fiscal years?
  • Which analysis is used to evaluate total price without examining the individual cost elements and is required for all acquisitions?
  • Which body may review agency decisions to determine whether a function is inherently governmental?
  • When is a detailed IGE required?
  • Threshold and approval for D&F 'Contract Type - Incentive Contracts'
  • Which statements describe an Administrative Contracting Officer under USACE?
  • Which module should contracting officers use to post solicitations, attachments, and amendments?
  • Which technique involves reviewing catalogs and other generally available product literature?
  • For an estimated contract value of $120,000,000, who is the SSA appointment?
  • What is the act of approving an unauthorized commitment called?
Subscribe

Get the latest from Passetra

You can unsubscribe at any time. Read our privacy policy